Bento KeyChain
Requirements
Attach top cable on pipe or truss using quick links
Build Time
60 minutes for 1 person to assemble a 20’x20′ backdrop
blax
Requirements
Tie on to pipe or truss using tieline on the back.
Build Time
30 minutes for 1 person to hang a 30′ x 20′ backdrop
ENTERTAINERS – dj table
Installed in the same manner as SuperLever product line.
For use with SuperLever Black, White and ALU connectors.
ENTERTAINERS – event table
Installed in the same manner as SuperLever product line.
For use with SuperLever Black, White and ALU connectors.
ENTERTAINERS – podium
Installed in the same manner as SuperLever product line.
For use with SuperLever Black, White and ALU connectors.
FABLOK – all inserts
Requirements
Hang from truss or pipe, or use ground supported for SuperColumn or SuperWall
Build Time
120 minutes for 1 person to assemble a 20′ x 20′ backdrop
FABLOK – backdrop
Requirements
Hang from truss using tieline with F4 and F2 connectors
Build Time
120 minutes for 1 person to assemble a 20′ x 20′ backdrop
FASTWALL – all panels
Requirements
Ground supported using FASTwall system
Build Time
60-70 minutes to build a 10′ x 10′ FASTwall
FASTWALL – FIR
Requirements
Ground supported using FASTwall system
Build Time
Varies per build
KEYCHAIN
Requirements
Secure cable around truss or pipe and base using the quick link connectors and attach Bento panels to cable via keyhole fastener
Build Time
1 hour for 1 person to assemble a 20′ x 20′ backdrop
no Show backdrop
Requirements
Tie on to pipe or truss. Modular units snap together.
Build Time
Varies per build
PILLOW
Requirements
Tie on to pipe or truss via grommets and ties
Build Time
10 minutes for 1 person to assemble a 20′ x 20′ backdrop
Ripple
Requirements
This is an insert panel for SlotLok system. Only supported with SlotLok.
Build Time
60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.
Shard
Requirements
This is an insert panel for SlotLok system. Only supported with SlotLok.
Build Time
60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.
SlotLok
Requirements
Use ground supported. Need SlotLok inserts to attach to build.
Build Time
60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.
SuperLever backdrop
Requirements
Tie to truss or pipe and base via tie line and SuperLever F4 connector
Build Time
30-60 minutes for 1 person to assemble a 20′ x 20′ backdrop
SuperLever Column
Requirements
Use SuperColumn ground supported systems
Build Time
5 minutes for 1 person to assemble one four-sided cube for a SuperColumn
SuperLever Wall
Requirements
Use SuperWall ground supported system
Build Time
60 minutes for 1 person to assemble a 10′ x 10′ SuperWall
SuperLever Wall with supports
Requirements
Use SuperWall with internal supports
Build Time
60 minutes for 1 person to assemble a 10′ x 10′ SuperWall
Supershapes
Requirements
SuperShapes require two people to assemble
Build Time
Varies per build
SuperArch
Requirements
SuperArches require two people to assemble
Build Time
Varies per build
SuperWall Corner
Requirements
Align bases in depicted order to build SuperWall Corner
Build Time
60 minutes for 1 person to assemble a 10′ x 10′ SuperWall Corner
SuperWall Staggered
Requirements
Stagger panels as you build to create SuperWall Staggered
Build Time
60 minutes for 1 person to assemble a 10′ x 10′ SuperWall Staggered
Vector Dot
Requirements
This is an insert panel for SlotLok system. Only supported with SlotLok.
Build Time
60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.
Vector
Requirements
This is an insert panel for SlotLok system. Only supported with SlotLok.
Build Time
60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.
WAFER
Requirements
Tie on to pipe or truss
Build Time
30 minutes for 1 person to assemble a 20′ x 20′ backdrop