Assembly Instruction - Atomic Design

Bento KeyChain


Requirements

Attach top cable on pipe or truss using quick links

Build Time

60 minutes for 1 person to assemble a 20’x20′ backdrop

blax


Requirements

Tie on to pipe or truss using tieline on the back.

Build Time

30 minutes for 1 person to hang a 30′ x 20′ backdrop

ENTERTAINERS – dj table


Installed in the same manner as SuperLever product line.

For use with SuperLever Black, White and ALU connectors.

ENTERTAINERS – event table


Installed in the same manner as SuperLever product line.

For use with SuperLever Black, White and ALU connectors.

ENTERTAINERS – podium


Installed in the same manner as SuperLever product line.

For use with SuperLever Black, White and ALU connectors.

FABLOK – all inserts


Requirements

Hang from truss or pipe, or use ground supported for SuperColumn or SuperWall

Build Time

120 minutes for 1 person to assemble a 20′ x 20′ backdrop

FABLOK – backdrop


Requirements

Hang from truss using tieline with F4 and F2 connectors

Build Time

120 minutes for 1 person to assemble a 20′ x 20′ backdrop

FASTWALL – all panels


Requirements

Ground supported using FASTwall system

Build Time

60-70 minutes to build a 10′ x 10′ FASTwall

FASTWALL – FIR


Requirements

Ground supported using FASTwall system

Build Time

Varies per build

KEYCHAIN


Requirements

Secure cable around truss or pipe and base using the quick link connectors and attach Bento panels to cable via keyhole fastener

Build Time

1 hour for 1 person to assemble a 20′ x 20′ backdrop

no Show backdrop


Requirements

Tie on to pipe or truss. Modular units snap together.

Build Time

Varies per build

PILLOW


Requirements

Tie on to pipe or truss via grommets and ties

Build Time

10 minutes for 1 person to assemble a 20′ x 20′ backdrop

Ripple


Requirements

This is an insert panel for SlotLok system. Only supported with SlotLok.

Build Time

60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.

Shard


Requirements

This is an insert panel for SlotLok system. Only supported with SlotLok.

Build Time

60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.

SlotLok


Requirements

Use ground supported. Need SlotLok inserts to attach to build.

Build Time

60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.

SuperLever backdrop


Requirements

Tie to truss or pipe and base via tie line and SuperLever F4 connector 

Build Time

30-60 minutes for 1 person to assemble a 20′ x 20′ backdrop

SuperLever Column


Requirements

Use SuperColumn ground supported systems

Build Time

5 minutes for 1 person to assemble one four-sided cube for a SuperColumn

SuperLever Wall


Requirements

Use SuperWall ground supported system

Build Time

60 minutes for 1 person to assemble a 10′ x 10′ SuperWall

SuperLever Wall with supports


Requirements

Use SuperWall with internal supports

Build Time

60 minutes for 1 person to assemble a 10′ x 10′ SuperWall

Supershapes


Requirements

SuperShapes require two people to assemble

Build Time

Varies per build

SuperArch


Requirements

SuperArches require two people to assemble

Build Time

Varies per build

SuperWall Corner


Requirements

Align bases in depicted order to build SuperWall Corner

Build Time

60 minutes for 1 person to assemble a 10′ x 10′ SuperWall Corner

SuperWall Staggered


Requirements

Stagger panels as you build to create SuperWall Staggered

Build Time

60 minutes for 1 person to assemble a 10′ x 10′ SuperWall Staggered

Vector Dot


Requirements

This is an insert panel for SlotLok system. Only supported with SlotLok.

Build Time

60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.

Vector


Requirements

This is an insert panel for SlotLok system. Only supported with SlotLok.

Build Time

60-80 minutes for 2 people to assemble a 12-unit, 30 panel wall.

WAFER


Requirements

Tie on to pipe or truss

Build Time

30 minutes for 1 person to assemble a 20′ x 20′ backdrop

Need help with installation?